Pictures from the Last Two Weeks

We apologize for the lack of pictures! The author of this blog has been on vacation and hasn’t had very much internet access. Here are some pictures of the kitchen over the past two weeks; you can clearly the progression we are making!

Day 20:

Wall coverings East wall Wall coverings South wall

Day 22:

North wall taped and spackled West wall taped and spackled

Day 28:

Stainless cabinets with protective covering on south wall - installed Stainless wall panels with protective covering on north wall - installed

Day 30:

Floor tiles installed around grease trap Floor tiles installed

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s